University Library Design Case Study:
The 4th floor of Boots Library is the most heavily used computer space in the university. The brief was to raise the quality of the student experience while maintaining the required number of computers and supporting 24/7 opening.
New desk designs were developed for individual study and for collaborative working. Everything in the design layout was evaluated with the university - technical staff tested computer installation on the prototype; students tried out chair styles for comfort; cleaning supervisors were consulted on recycling bin stations.
Quality and attention to detail at all stages from concept to fit-out have created a high-impact and robust environment.
Student feedback has been really positive, with comments such as ‘Refreshing’, ‘A real place you can work’ and ‘Fantastic! It’s so much better, a breath of fresh air.
The first new library built in the County for 20 years meant expectations were high at Thame for the library service and politicians as well as the local community.
The new Library and Customer Service Centre at Risca is built as a modern extension behind the restored façade of the old Palace Cinema which had been derelict for many years.
Opening the Book was contracted to deliver an interior design which made the space lighter and brighter, implemented a successful transition from staff-led counter service to self-service via RFID and improved the customer experience for over 500,000 people visiting the library each year.
Opening the Book was first appointed by Mace to work with the architects, structural engineers, project managers, landscape architects, mechanical and electrical designers at Stages A-E of the planned new building.
Transforming the old chapel in a 19th century school into a contemporary, practical library was an exciting challenge for our design team.
Werneth School in Stockport moved to a new purpose-built home on the school site. How could all the successful library activities be fitted into a smaller space?
Opening the Book first visited St Mary’s Church, Lichfield, in 2016 to consider the feasibility of the library being part of a larger refurbishment project.
This was a first for Opening the Book and gave us an opportunity to explore how we could bring the same aesthetic of integrating books and play that we bring to our public library projects into a very challenging, much more compact environment.
At Gateshead, Opening the Book created a successful MakerPlace in their existing Sound Gallery.
Opening the Book refurbished Gateshead Central Lending Library, including children’s and young adult areas, in 2009 so we were delighted to return to complete the work with a transformation of the computer and reference areas into the new Gateshead Archive.
In 2020 Conwy CBC had an opportunity to provide a new community hub for rural Conwy when the building which had been the Glasdir Business and Conference Centre in Llanrwst became available.
Opening the Book was excited to work with Doncaster MBC in creating the new Danum centre, bringing together the Central Library, the Museum and the Art Gallery to one site.