St Mary’s Church, Lichfield
This is what churches used to be used for - meeting places, community places, places where people would gather to talk. That’s what the library brings now.
Public Library Design Case Study:
Opening the Book first visited St Mary’s Church, Lichfield, in 2016 to consider the feasibility of the library being part of a larger refurbishment project. The space was not, on first impression, very promising – it was dark, with low ceilings, lots of barriers and huge pillars which had been truncated by the extra floor added into the nave. But then we entered the chapel area with its magnificent stained glass window and suddenly the building opened up. This space really was beautiful – now the question was, could it be a library? How could we make the low-ceilinged area more attractive? And how could we best use the chapel, given that listed features such as pews and railings must remain, and anything in front of the main altar space must be moveable to allow the annual mayor-making ceremony to take place?
The commitment of everyone involved to breathe new life into this building carried us through the next two years of planning and overcoming obstacles. The library team, led by Catherine Mann, Libraries and Arts Manager, saw the potential from the outset, St Mary’s Guild provided the vision for a new cultural space and local architects, BHB, solved the problems of internal heights and access with a wonderful walkway between the nave and the chapel that looks as if it’s always been part of the building fabric.
The result is one of the most successful projects we have ever been involved in. In the 4 months since opening in January 2019, visitors have doubled from 50,000 in the old library to 100,000 in the new one and new members have also doubled. Most pleasing of all to staff who do a great job of making the books look good, issues are up by 18% - and this in a footprint considerably smaller than the previous library.
The challenge was to create a contemporary library offer in a historic space. We started with respect for the building and worked closely with Simon Keen, the architect, to maximise the impact of pillars and restored stonework. Curved shelving and desking matched the new curved walkway and created softer and more intimate discoveries within the grand exterior envelope. Computers, large screens, access to plug in your own device and a children’s digitable bring a modern approach to IT.
The colour scheme was developed on site to complement the true colours of the restored stonework as they were gradually revealed. The yellow and grey has a calming effect with pops of brighter colour on the seating. The children’s area is a lighter blue and oak with the clever use of our Big Book Storytime Feature making the seating, play and performance area feel generous even in a tight space. A detail of the metal decorative hinge was picked up as a motif on the bookcase signage headers and enlarged as an attractive manifestation on the revolving entrance doors instead of the standard two rows of dots.
Alongside the library offer there is also a History Access Point, Tourist Information Centre and St Mary’s Gallery & Performance space on the upper floor. The views up towards and down from the new glazed parapet are breathtaking. It is clear from the months following the opening that not only the magnificent church has been rescued, the whole Market Square feels revitalised with this new presence.
I found it really hard to imagine how a church could become an accessible and attractive library space. However, Opening the Book filled me with confidence that this was achievable and you were absolutely right! A huge thank you from me for all of the imagination and creativity which you have bought to this project. We have created a unique library with an amazing atmosphere.
The first new library built in the County for 20 years meant expectations were high at Thame for the library service and politicians as well as the local community.
The 4th floor of Boots Library is the most heavily used computer space in the university. The brief was to raise the quality of the student experience while maintaining the required number of computers and supporting 24/7 opening.
The new Library and Customer Service Centre at Risca is built as a modern extension behind the restored façade of the old Palace Cinema which had been derelict for many years.
Opening the Book was contracted to deliver an interior design which made the space lighter and brighter, implemented a successful transition from staff-led counter service to self-service via RFID and improved the customer experience for over 500,000 people visiting the library each year.
Opening the Book was first appointed by Mace to work with the architects, structural engineers, project managers, landscape architects, mechanical and electrical designers at Stages A-E of the planned new building.
Transforming the old chapel in a 19th century school into a contemporary, practical library was an exciting challenge for our design team.
Werneth School in Stockport moved to a new purpose-built home on the school site. How could all the successful library activities be fitted into a smaller space?
This was a first for Opening the Book and gave us an opportunity to explore how we could bring the same aesthetic of integrating books and play that we bring to our public library projects into a very challenging, much more compact environment.
At Gateshead, Opening the Book created a successful MakerPlace in their existing Sound Gallery.
Opening the Book refurbished Gateshead Central Lending Library, including children’s and young adult areas, in 2009 so we were delighted to return to complete the work with a transformation of the computer and reference areas into the new Gateshead Archive.
In 2020 Conwy CBC had an opportunity to provide a new community hub for rural Conwy when the building which had been the Glasdir Business and Conference Centre in Llanrwst became available.
Opening the Book was excited to work with Doncaster MBC in creating the new Danum centre, bringing together the Central Library, the Museum and the Art Gallery to one site.